A biomass processing and pelletizing plant complex is planned in Naujoji Akmenė. Several production buildings connected by canopies, as well as outdoor infrastructure such as storage areas, silos, silos, storage tanks and an administrative building are planned for an area of about 1 ha.
The complex is designed for the crushing, drying and pelletizing of biomass, ensuring efficient use of energy and meeting environmental requirements. The production processes are organised in such a way as to minimise noise and pollution.
The project contributes to the development of renewable energy and the strengthening of local industry in the region.
Mes naudojame slapukus, kurie užtikrina, kad Jums bus patogu naudotis tinklalapiu. Jei toliau naršysite mūsų tinklalapyje, tai tolygu Jūsų sutikimui su slapukų naudojimu.